|
|
Project Showcase
The multi‐channeled 72” custom built detention system was needed to retain some 110K/ft3 stormwater runoff from Rt.5 and surrounding streets. Can Reinforced Concrete Pipe carry the load—you bet, all 825 tons Oldcastle provided PennDOT District 3 with pipe for all phases of construction preformed on this roadway since the early 1990’s |
|
|